July 2016: Avecom and KWR start construction of Power-to-Protein pilot plant
This summer Avecom and KWR will start the construction of the pilot plant for the production of SCP on-site. Recently the functional design was completed including the P&ID and subsequently a HAZOP was performed.
The first pilot location will be at the WWTP Enschede of Water Board Vechtstromen.